Sunday, June 27, 2010

'25/6/10'

Today is my last day doing the industrial training at the sony. Since i was here, i have learnt a lot of things about the testing and electrical. I also got some knowlegde about the basic of the TV.

'5/5/10'

I do a power consumption test. For this test, all of the parameters are set to the maximum. I need to record the value for the ON and STANDBY mode. For the ON mode, i need to take the value after 15 minutes and 5 minutes for the STANDBY mode.

'3/5/10'

I have done the leakage current measurement. For this test, we are refer to the main board as a main point. There are several types of main board. The main board will be represent the destination. Each board have different condition.

Tuesday, June 8, 2010

'30/4/10'

Today, the audit officer was came to visit our department. I also sent some equipments to calibrate. Ms. Aimi was explained to me little big about the clearance and creepage test and also the short test.

'27/4/10'

Today i have attend the sony meeting. During that time, i need to explain what i have learnt before. After that meeting, i learn about how to do the power consumption measurement. For this test, everything i need to set to the maximum condition.

'22/4/10'

Today, i do some of the soldering works. I also learn about surge test measurement. For this test, i need to perform withstanding/insulation test before and after doing the surge test.

'20/4/10'

I learn how to do the screw test, bump test and also impact test for the new model of TV set. I also do the humidity test. For the humudity test, it will take 5 days to complete.